Guide to the Seacoast Anti-Pollution League Papers, 1969-1989

Collection number: MC 136

Size: 74 boxes (24.66 cu.ft.)

About the Seacoast Anti-Pollution League

The Seacoast Anti-Pollution League was formed on March 29, 1969 in response to the Public Service Company of New Hampshire’s announcement of its intent to construct a nuclear power plant in Seabrook, New Hampshire. Although in response to the proposed plant, SAPL formulated its mission to encompass other seacoast New Hampshire environmental concerns. Even so, SAPL’s primary emphasis from inception through 1990 was on the Seabrook Plant.

From the time that PSNH began to survey the proposed location in Seabrook and to seek initial approval from state and federal government SAPL engaged in legal intervention to halt and/or hinder the process. Through these actions SAPL hampered the issuance of construction permits, forced changes in construction design in regards to the cooling tunnels of the plant, and sought various other changes in design to preserve the salt-marshes upon which the plant was built. As construction neared completion in the early 1980s SAPL’s emphasis shifted to concern about emergency preparedness and nuclear safety issues. It played a major role as intervenor in the various hearings before the NRC regarding issuance of an operating license to PSNH. Together with the Attorney General’s Office of Massachusetts and the New England Coalition on Nuclear Power, SAPL sought to prevent the issuance of an operating license on the grounds that the company’s and the state’s radiological emergency plans were inadequate for the assurance of public safety.

About the Seacoast Anti-Pollution League Papers

The Seacoast Anti-Pollution League Collection contains five series, primarily covering the years 1978 to 1989. The first series contains materials about the function and organization of SAPL and consists of office files, correspondence, financial materials, publications, and materials related to specific activities of the organization. These papers also reflect SAPL’s use of the court system to seek its ends where other intervention failed.

The second series contains reports analyzing safety and environmental concerns surrounding the construction and operation of the Seabrook Nuclear Power Plant, while the third series consists of materials relating to the issuance of a license for the construction of the plant. The fourth series comprises materials related to the fight over the issuance of an operating license. SAPL took an active role in seeking the denial of this license because of its concerns with emergency preparedness issues and nuclear safety. The papers in this series reflect SAPL’s emphasis on participation in the relevant hearings before the various boards of the NRC. The final series contains miscellaneous documents concerning the Seabrook Nuclear Power Plant from sources other than SAPL.

Administrative Information

Access Restrictions

This collection is open.

Copyright Notice

Contents of this collection are governed by U.S. copyright law. For questions about publication or reproduction rights, contact Special Collections staff.

Preferred Citation

[Identification of item], Seacoast Anti-Pollution League Papers, 1968-1989, MC 136, Milne Special Collections and Archives, University of New Hampshire Library, Durham, NH, USA.

Acquisitions Information

Donations: Jean Lincoln, October 19, 1991; Charles Pratt, January 26, 1994 and December 22, 1994; Seacoast Anti-Pollution League, December 8, 1998 (Accession numbers: 9107, 94.005, 94-046, 98.018)

Collection Arrangement

This collection is arranged into five series, some of which are in turn divided into further subseries. The material is mostly arranged chronologically within each series and subseries. Box numbering starts over with each new series. Therefore it is important to specify the series number when requestion materials from this collection.

List of frequently used acronyms:

  • AEC: Atomic Energy Commission (forerunner of NRC); also seen as USAEC
  • ASLAB: Atomic Safety and Licensing Appeal Board of the NRC
  • ASLB: Atomic Safety and Licensing Board of the NRC
  • CWIP: Construction Work in progress
  • EPZ: Emergency Planning Zone
  • ETE: Evacuation Time Estimate
  • FOIA: Freedom of Information Act
  • MMWEC: Massachusetts Wholesale Municipal Electric Company
  • NECNP: New England Coalition on Nuclear Pollution
  • NHRERP: New Hampshire Radiological Emergency Response Plan
  • NRC: Nuclear Regulatory Agency
  • OL: Operating License
  • PSCo: Public Service Company
  • PSNH: Public Service of New Hampshire
  • PUC: Public Utilities Commission
  • RERP: Radiological Emergency Response Plan
  • SAPL: Seacoast Anti-Pollution League

Collection Contents

Series I: Seacoast Anti-Pollution League History and Organization, 1970-1989

(8 Boxes)

Subseries A: History

Box 1
Box 1, Folder 1 SAPL History, Chronologies
Box 1, Folder 2 SAPL History, SAPL Statements
Box 1, Folder 3 SAPL History, Reports and Studies Primarily about SAPL

Subseries B: Office Matters

Box 1, Folder 4 Phone Logs, dates unclear
Box 1, Folder 5 1981, SAPL Phone Lists
Box 1, Folder 6 April l988, Conference Calls
Box 1, Folder 7 1979-1989, Minutes of SAPL Meetings
Box 1, Folder 8 1980, Field Director Job Applicants

Subseries C: Finances

Box 1, Folder 9 Miscellaneous Finances
Box 1, Folder 10 1977-1983, Fundraising, Phone Solicitations
Box 1, Folder 11 1982, Fundraising, Seacoast Jazz Festival
Box 1, Folders 12-13 1982, Fundraising, Road Race
Box 1, Folder 14 1983-1985, Fundraising, SAPL Members Renewal Project
Box 1, Folder 15 1983, Fundraising, Inquiries to Tom Rush re. benefit concert
Box 1, Folder 16 1983, Fundraising, Dinner for 2 Raffle
Box 1, Folder 17 SAPL Canvass
Box 1, Folder 18 Donations and Requests for Information
Box 1, Folder 19 Fundraising, T-Shirt Marketing
Box 1, Folder 20 Current fundraisers, “Spring Into Summer” Raffle
Box 1, Folder 21 Fundraising, Miscellaneous
Box 1, Folder 22 Advertising Ideas
Box 1, Folder 23 Master Copies of Mailings

Subseries D: Correspondence

Box 2
Box 2, Folder 1 1970-1979, Correspondence to SAPL
Box 2, Folder 2 1980, Correspondence to SAPL
Box 2, Folder 3 1981, Correspondence to SAPL
Box 2, Folder 4 1981, Correspondence to SAPL re. Industrial Development in Kingston, NH
Box 2, Folder 5 1982, Correspondence to SAPL
Box 2, Folder 6 1982, March 1, Correspondence to SAPL from Alexander Sidar re. “The Seabrook Disaster Book Idea”
Box 2, Folder 7 1983, Correspondence to SAPL
Box 2, Folder 8 1984, Correspondence to SAPL
Box 2, Folder 9 1984, Correspondence from Dan Tuthill to SAPL
Box 2, Folder 10 1985, Correspondence to SAPL
Box 2, Folder 11 1986, Correspondence to SAPL
Box 2, Folder 12 1987, Correspondence to SAPL
Box 2, Folder 13 1988, Correspondence to SAPL
Box 2, Folder 14 1989, Correspondence to SAPL
Box 2, Folder 15 Undated Correspondence to SAPL
Box 2, Folder 16 1973-1979, Correspondence from SAPL
Box 2, Folder 17 1980, Correspondence from SAPL
Box 2, Folder 18 1981, Correspondence from SAPL
Box 2, Folder 19 1982, Correspondence from SAPL
Box 2, Folder 20 1983, Correspondence from SAPL
Box 2, Folder 21 1984, Correspondence from SAPL
Box 2, Folder 22 1985, Correspondence from SAPL
Box 2, Folder 23 1986, Correspondence from SAPL
Box 2, Folder 24 1987, Correspondence from SAPL
Box 2, Folder 25 1988, Correspondence from SAPL
Box 2, Folder 26 Undated Correspondence from SAPL
Box 2, Folder 27 Miscellaneous Correspondence

Subseries E: Publications

(see also: Series I, Box 9)

Box 3
Box 3, Folder 1 1978-1989, SAPL Press Releases
Box 3, Folder 2 1984, Sept 4, Press Release with draft material
Box 3, Folder 3 1972-1989, SAPL News
Box 3, Folder 4 1982, Newsletter Material
Box 3, Folder 5 1983, Newsletter Material
Box 3, Folder 6 1984, [October?], Newsletter Material
Box 3, Folder 7 Articles Reprinted by SAPL
Box 3, Folder 8 Flyers and Other Printed Material
Box 3, Folder 9 Informational Flyers

Subseries F: SAPL Activities

Box 3, Folder 10 1972-1978, SAPL Testimony
Box 3, Folder 11 1973-1981, General SAPL Activities and Statements
Box 3, Folder 12 1982, May, Oyster River School Student Comments on SAPL Talk
Box 3, Folder 13 1982, SAPL vs. NRC, 690 f. 2d. 1025, before US Court of Appeals
Box 3, Folder 14 1983, Results of SAPL Survey of Radiological Emergency Response Plan[RERP], SAPL Hospital Survey
Box 3, Folder 15 1983, Notes re. RERP Survey, SAPL Hospital Survey
Box 3, Folder 16 1983, Correspondence re. RERP Survey, SAPL Hospital Survey
Box 3, Folder 17 1983, Responses to SAPL RERP Survey, SAPL Hospital Survey
Box 3, Folder 18 1983, Responses to SAPL RERP Survey, SAPL Hospital Survey
Box 3, Folder 19 1983, Negative Responses to SAPL RERP Survey, SAPL Hospital Survey
Box 3, Folder 20 1983, Background Files, RERP Survey of NY Public Interest Research Group, 1982, SAPL Hospital Survey
Box 3, Folder 21 1983, Background Files, Materials from Dr. Tye’s Study re. RERP, SAPL Hospital Survey
Box 3, Folder 22 1983, Background Files, [1982-1983], Miscellany re. RERP Survey of Hospital Emergency Prep
Box 4
Box 4, Folder 1 1983-1984, Beach Survey
Box 4, Folder 2 1986, Signatures on Petitions re Emergency Response Planning

Subseries G: Miscellaneous Notes

Box 4, Folder 3 Notes for SAPL’s Brief in support of Appeal of Issuance of Partial Operating License before ASLAB
Box 4, Folder 4 Notes on Applicant’s Response to Interrogatories
Box 4, Folder 5 Work Papers, Contentions
Box 4, Folder 6 Work Papers, Contentions
Box 4, Folder 7 Work Papers, re SAPL Contentions
Box 4, Folder 8 Draft SAPL Proposed findings of Fact and Conclusions of Law and Proposed Form of Decision
Box 4, Folder 9 Draft of SAPL 4th. Supplemental Petition for Leave to Intervene, re Evacuation Time Estimates, [c.1985]
Box 4, Folder 10 1986, March 25-26, Notes on Prehearing Conference
Box 4, Folder 11 1986, Work Papers, SPDS Issues, re SAPL actions vis a vis NH Contention 10, 1986 and following
Box 4, Folder 12 1986, May 15, Draft of SAPL Contention #31, SAPL 4th Supplemental Petition for Leave to Intervene
Box 4, Folder 13 Unidentified Notes

Subseries H: Files on Other Activist Groups

Box 4, Folder 14 Appeal To Reason
Box 4, Folder 15 1982-1984, Atlantic Center for the Environment
Box 4, Folder 16 Citizen Alert
Box 4, Folder 17 Citizen’s Clearinghouse on Toxic Waste
Box 4, Folder 18 1980, CEPAG (Citizen’s Energy Policy Advisory Group), CEPAG Report
Box 4, Folder 19 1977, Citizen’s Movement for Safe and Efficient Energy (CMSEE), Critical Mass Journal
Box 5
Box 5, Folder 1 1978, CMSEE, Critical Mass Journal
Box 5, Folder 2 Clamshell Alliance and Affiliated Groups
Box 5, Folder 3 1987, February to June, Coalition for Reliable energy, (Industry Front Group)
Box 5, Folder 4 Committee to Bridge the Gap
Box 5, Folder 5 Critical Mass Energy Project
Box 5, Folder 6 Critical Mass Energy Project
Box 5, Folder 7 Employee’s Legal Project, Workers Legal Union
Box 5, Folder 8 Energy Systems Research Group
Box 5, Folder 9 Environmental Action Foundation, Conference and Other Material
Box 5, Folder 10 Environmental Policy Institute, Conference on Nuclear Waste, Options for the Future
Box 5, Folder 11 1980-1983, Midcoast Health Research Group
Box 5, Folder 12 1980-1983, Midcoast Health Research Group
Box 6
Box 6, Folder 1 Miscellaneous Advocacy Groups
Box 6, Folders 2-3 1983, March, National Nuclear Intervenors Conference
Box 6, Folder 4 Natural Rights
Box 6, Folder 5 New England Coalition on Nuclear Pollution
Box 6, Folder 6 New England Peace Movement Newsletter
Box 6, Folder 7 1982-1987, New Hampshire Natural Resources Forum
Box 6, Folder 8 Nuclear Control Institute
Box 6, Folder 9 Nuclear Information Research Center
Box 6, Folder 10 Public Citizen Critical Mass Energy Project
Box 6, Folder 11 Radioactive Waste Campaign
Box 6, Folders 12-15 Safe Energy Communication Council (SECC)
Box 7
Box 7, Folder 1 1987, February, Tri-State Coalition for Public Safety
Box 7, Folder 2 Union of Concerned Scientists
Box 7, Folder 3 1981, United Nuclear Opponents
Box 7, Folder 4 1982-1983, United Nuclear Opponents
Box 7, Folder 5 Vermont Public Interest Research Group
Box 7, Folder 6 Viewpoint
Box 7, Folder 7 Other Nuclear Group Stuff

Subseries I: Miscellaneous

Box 7, Folder 8 1985-1988, “Bob’s Articles,” Articles by Robert Backus
Box 7, Folder 9 1987, Forum on Radiological Emergency Response and Seabrook Nuclear Power Plant: Safety Issues and Concerns for Educational Institutions
Box 7, Folder 10 Information on Karen Silkwood
Box 7, Folder 11 1985, Leadership Conference on Nuclear Waste
Box 7, Folder 12 Miscellaneous
Box 7, Folder 13 1982, New England Environmental Conference
Box 8
Box 8, Folder 1 NRC Miscellany
Box 8, Folder 2 Pamphlets on effective Use of Government and Media Resources
Box 8, Folder 3 1981, Portsmouth Gasohol Plant
Box 8, Folder 4 Public Citizen’s Nuclear Waste Study
Box 8, Folder 5 1979, September, “Unique Wildlife Ecosystem Concept Plan State of New Hampshire,” U.S. Dept. of Interior, U.S. Fish and Wildlife Service
Box 8, Folder 6 Chris Wood’s Paper on State’s Rights in Nuclear Licensing
Box 9
Box 9, Folder 1 SAPL Flyers and Flyer Material
Box 9, Folder 2 1981, SAPL Petition re Emergency Planning

Series II: Preliminary Studies and Ecological Surveys Regarding Seabrook Nuclear Power Plant, 1969-1986

(6 Boxes)

Box 1
Box 1, Folder 1 1969-1970, Seabrook Ecological Study: Phase I, Hampton Seabrook Estuary, NH
Box 1, Folder 2 1971, Seabrook Ecological Study
Box 1, Folder 3 1972-1975, Summary Report of Hydrographic Studies Off Hampton Beach, NH, Sept 1972 to March 1975
Box 1, Folder 4 1972, October, Report on the Terrestrial effects of Salt Fallout from Thermal Cooling Systems
Box 1, Folder 5 1972, October, Evaluation of Environmental Effects from Evaporative Heat Dissipation Systems at the Seabrook Site
Box 1, Folder 6 1972, November, Seabrook Station: Land Planning and Site Design Study
Box 2
Box 2, Folder 1 1972, December, An Interim Progress Report on the Environmental Study Program Hampton-Seabrook Estuary and Near Offshore Waters
Box 2, Folder 2 1972-1973, Environmental Study Program, Hampton-Seabrook Estuary and Near Offshore waters
Box 2, Folder 3 1975, “Summary Reports on Hydrographic Studies Off Hampton Beach, NH, Including the Hampton Harbor Estuary and the Western Gulf of Maine, September 1972 to March 1975,” Technical Report VI-8
Box 2, Folder 4 1973, June, Seabrook Station Preliminary Safety Analysis Report (vol.II), 1 of 7
Box 2, Folders 5-9 1973, June, Preliminary Safety Analysis
Box 3
Box 3, Folder 1 1973, June, Preliminary Safety Analysis
Box 3, Folder 2 1973, June, Seabrook Ecological Study, “The Benthos of the Area Offshore Hampton and Seabrook Beaches, NH,” Tech Report IV-5
Box 3, Folder 3 1973, July, Seabrook Station Preliminary Safety Analysis Report, Amendment 1, revision pages
Box 3, Folder 4 1973-1974, “Finfish Ecology Investigations at the Hampton-Seabrook Estuary, NH and Adjoining Coastal Waters,” Technical Report V-3
Box 3, Folder 5-9 1974, January, Seabrook Station Preliminary Safety Analysis Report, Amendment 5
Box 4
Box 4, Folders 1-4 1974, January, Preliminary Safety Analysis Report
Box 4, Folder 5 1974, May, Geologic, Seismologic and Rock Mechanic Investigations for Seabrook Station
Box 4, Folder 6 1973-1974, “Hydrothermal Studies of Diffuser Discharge in the Coastal Environment: Seabrook Station for PSCNH”
Box 4, Folder 7 1974, August 14, Safety Evaluation of the Seabrook Nuclear Power Station, Units 1 and 2, issue date 8/14/74; supplement 8/20/74
Box 4, Folder 8 1974, August 20, Supplement no.1 to the Safety Evaluation Report by Directorate of Licensing USAEC in matter of PSNH
Box 4, Folder 9 1974, October, Seabrook Station Containment Aircraft Impact Analysis
Box 4, Folder 10 1974, October 8, Supplement no.2
Box 4, Folder 11 1974, December, Roadway Network and Evacuation Study
Box 4, Folder 12 1974-1975, Seabrook Ecological Study, 1975, “Finfish Ecology Investigations at the Hampton-Seabrook Estuary, NH and Adjoining Coastal Waters,” Tech. report VI-7
Box 4, Folder 13 1975, March 14, Supplement #3 to the Safety Evaluation Report
Box 4, Folder 14 1975, June, “The Benthos Inhibiting the Area of the Proposed location of the Seabrook Station Intake”
Box 5
Box 5, Folder 1 1975 to 1976, “The Spatial and Temporal distribution of the Larvae of the Soft-Shelled Clam, Mya Arenaia, in NH Coastal Waters, 7/75 to 11/76,” Tech Report VI-10
Box 5, Folder 2 1975, Nov 14, Supplement #4 to the Safety Evaluation Report
Box 5, Folder 3 1975, December, “Probability of Coastal Waters Entering the Hampton Harbor Estuary and Neighboring Estuaries as a Function of Distance and Depth Offshore,” Tech. Report VI-9
Box 5, Folder 4 1975, Basic Findings of Fact by the Bulk Power Site Evaluation Committee in Connection with the Proposed Nuclear Generating Facility at Seabrook, NH
Box 5, Folder 5 1977, December, Summary Document: Assessment of Anticipated Impacts of Construction and Operation of Seabrook Station on the Estuarine, Coastal and Offshore Waters of Hampton-Seabrook, NH
Box 5, Folder 6 1982, May, Draft Environmental Statement Related to the Operation of Seabrook Station
Box 5, Folder 7 1982, August, Probabilistic Risk Assessment, “Seabrook Station Probabilistic Safety Assessment,” pp.1-99
Box 5, Folder 8 1982, August, Probabilistic Risk Assessment, pp.100-end
Box 5, Folder 9 1982, December, Final Environmental Statement Related to Operator of Seabrook Station, Units 1 and 2, USNRC, Dept. of Nuclear Reactor Regulation
Box 6
Box 6, Folder 1 1984, January to June, Sea Grant Coastal Access Study
Box 6, Folder 2 1986, July, Safety Evaluation Report Related to the Operation of Seabrook Station Units 1 and 2

Series III: Seabrook Construction Licensing Issues, 1972-1978

(15 Boxes)

Box 1
Box 1, Folder 1 1972, March 31, PSCNH Long range Plans for Bulk Power Supply Facilities
Box 1, Folder 2 1972, October 3, State of New Hampshire Joint Hearings of the Public Utilities Commission[PUC] and the Site Evaluation Committee, vol.5, pp.706 to 876
Box 1, Folder 3 1972, October 4, Joint Hearings, vol.6, pp.787 to 1047
Box 1, Folder 4 1972, October, Joint Hearings, vol.7, pp.1048 to 1271
Box 1, Folder 5 1972, October 31, Joint Hearings, vol.9, pp. 1495 to 1589
Box 1, Folder 6 Joint Hearings, vol.11, pp. 1886 to 2050
Box 2
Box 2, Folder 1 1972, November, Joint Hearings, vol.12, pp.2051 to 2235
Box 2, Folder 2 1972, November, Joint Hearings, vol.13, pp.2236 to 2402
Box 2, Folder 3 1972, November 21, Joint Hearings, vol.14, pp.2403 to 2641
Box 2, Folder 4 1972, December 6, Joint Hearings, vol.15, pp.2642 to 2790
Box 2, Folder 5 1972, December 12, Joint Hearings, vol.17, pp.2894 to 3037
Box 2, Folder 6 1972, December 19, Joint Hearings, vol.l8, pp.3038 to 3174
Box 3
Box 3, Folder 1 1973, January 11, Joint Hearings, vol.19, pp.3175 to 3361
Box 3, Folder 2 1973, January 12, Joint Hearings, vol.20, pp.3362 to 3489
Box 3, Folder 3 1973, January 18, Joint Hearings, vol.21, pp.3490 to 3596
Box 3, Folder 4 1973, February 8, Joint Hearings, vol.22, pp.3597 to 3815
Box 3, Folder 5 1973, February 9, Joint Hearings, vol.23, pp.3816 to 3941
Box 3, Folder 6 1973, February 9, Joint Hearings, vol.23, pp.3942 to 4082
Box 3, Folder 7 1973, March 8, Joint Hearings, vol.24, pp.4083 to 4288
Box 4
Box 4, Folder 1 1973, March 9, Joint Hearings, vol.25, pp.4289 to 4460
Box 4, Folder 2 1973, March 22, Joint Hearings, vol.26, pp.4461 to 4686
Box 4, Folder 3 1973, March 23, Joint Hearings, vol.27, pp.4687 to 4930
Box 4, Folder 4 1973, April 13, Joint Hearings, vol.29, pp.5103 to 5308
Box 4, Folder 5 1973, May 4, Joint Hearings, vol.30, pp.5309 to 5423
Box 5
Box 5, Folder 1 1973, May 21, Joint Hearings, vol.31, pp.5454 to 5544
Box 5, Folder 2 1973, May 21, Joint Hearings, vol.31, pp.5545 to 5663
Box 5, Folder 3 1973, May 25, Joint Hearings, vol.32, pp.5664 to 5776
Box 5, Folder 4 1973, May 25, Joint Hearings, vol.32, pp.5777 to 5880
Box 5, Folder 5 1974, February 4, Testimony of Dr. Charles Chichetti and William Gillen before the State of NH PUC and Bulk Power Supply Site Committee, l of 4
Box 5, Folder 6 1974, February 4, Testimony, 2 of 4
Box 5, Folder 7 1974, February 4, Testimony, 3 of 4
Box 5, Folder 8 1974, February 4, Testimony, 4 of 4
Box 5, Folder 9 1974, March 11, Public Hearings before the US Atomic Energy Commission, vol.2, pp.93 to 332
Box 6
Box 6, Folder 1 1974, December 12, Public Hearings, vol.5, pp.634 to 748
Box 6, Folder 2 1975, April 16, Public Hearings, vol.6, pp.749 to 970
Box 6, Folder 3 1975, May 29, Public Hearings, vol.9, pt.1, pp.1327 to 1448
Box 6, Folder 4 1975, May 29, Public Hearings, vol.9, pt.2, pp.l449 to 1601
Box 6, Folder 5 1975, May 30, Public Hearings, vol.10, pt.1, pp.l602 to 1732
Box 6, Folder 6 1975, May 30, Public Hearings, vol.10, pt.2, pp.1733 to 1866
Box 7
Box 7, Folder 1 1975, June 30, Public Hearings, pp.4217 to 4397
Box 7, Folder 2 1975, July 1, Public Hearings, vol.14, pp.4398 to 4591
Box 7, Folder 3 1975, July 2, Public Hearings, vol.15, pp.4592 to 4774
Box 7, Folder 4 1975, July 3, Public Hearings, vol.16, pp.4775 to 4957
Box 7, Folder 5 1975, August 26, Public Hearings, vol.l7, pp.4958 to 5174
Box 8
Box 8, Folder 1 1975, August 27, Public Hearings, vol.18, pp.5175 to 5313
Box 8, Folder 2 1975, August 28, Public Hearings, vol.l9, pp.5314 to 5538
Box 8, Folders 3-4 1975, September 3, Public Hearings, pp.5709 to 5818, with Final Environmental Impact Statement, 1 of 2
Box 8, Folder 5 1975, September 17, Public Hearings, vol.22, pp.7108 to 7315
Box 9
Box 9, Folder 1 1975, October 22, Public Hearings, vol.32, pp.9857 to 10070
Box 9, Folder 2 1975, October 23, Public Hearings, vol.33, pp.10071 to 10270
Box 9, Folder 3 1975, October 24, Public Hearings, vol.34, pp.10271 to 10415
Box 9, Folder 4 1975, October 29, Public Hearings, vol.36, pp.10621 to 10747
Box 9, Folder 5 1975, October 30, Public Hearings, vol.37, pt.1, 10748 to 10840
Box 9, Folder 6 1975, October 30, Public Hearings, vol.37, pt.2, 10841 to 10969
Box 10
Box 10, Folder 1 1975, [November 1], Public Hearings, vol.38, pp.10970 to 11053
Box 10, Folder 2 1975, November 4, Public Hearings, vol.39, pt.1, pp.11054 to 11006
Box 10, Folder 3 1975, November 4, Public Hearings, vol.39, pt.2, Applicants Direct Testimony #23
Box 10, Folder 4 1975, November 4, Public Hearings, vol.39, pt.3, pp.1107 to 11229
Box 10, Folder 5 1975, November 5, Public Hearings, vol.40, pp.11230 to 11406
Box 10, Folder 6 1975, November 6, Public Hearings, vol.41, pt.1, pp.11407 to 11426
Box 10, Folder 7 1975, November 6, Public Hearings, vol.41, pt.2, pp.11427 to 11579
Box 10, Folder 8 1975, November 7, Public Hearings, vol.42, pp.11580 to 11656
Box 11
Box 11, Folder 1 1975, November 18, Public Hearings, vol.43, pp.11657 to 11835
Box 11, Folder 2 1975, November 24, Public Hearings, vol.44, pp.12018 to 12217
Box 11, Folder 3 1976, February 25, Public Hearings, vol.45, pp.12218 to 12419
Box 11, Folder 4 1976, February 27, Public Hearings, pp.12674 to 12714
Box 11, Folder 5 1974, Seabrook Master Schedules, Revised as of January 1974
Box 11, Folder 6 1974, PSCo Responses to Intervenors
Box 11, Folder 7 1975, February 7, Information Submitted to EPA in Connection with PSCoNH Application for a 316(a) Exemption
Box 12
Box 12, Folder 1 1975, May 21, Memorandum and Order, (ALAB-271)
Box 12, Folder 2 1975, June 18, Letter from Bruce Bekley, project manager PSNH, to Dr. R. P. Geckel, project manager USNRC
Box 12, Folder 3 1975, July 30, Letter, Gossick to Thompson
Box 12, Folder 4 1975, August, Affidavit, Testimony of James Gekas of Federal Power Commission before ASLB
Box 12, Folders 5-9 1975, August, Fire Protection System Evaluation and Comparison to Branch Technical Position
Box 12, Folder 10 1975, September 2, New England Coalition on Nuclear Pollution Testimony on Energy Alternatives
Box 12, Folder 11 1975, September 4, Commonwealth of Massachusetts Testimony on Alternative Energy Sources I, Solid Waste Resource Recovery Before ASLB
Box 12, Folder 12 1975, November 11, Motion for Reconsideration of Board Decision Not to Extend Hearings on Cost-Benefit Issue
Box 12, Folder 13 1975, December 15, Requests for Proposed Findings of Facts and Rulings of Law Submitted by SAPL and the Audubon Society of NH
Box 12, Folder 14 1975, December 16, Applicant’s response to Motion of NECNP et al, ASLAB and ALSB
Box 12, Folder 15 1975, December, Applicant’s Proposed Findings of Fact and Conclusions of Law in the Form of a Proposed finding of Law
Box 12, Folder 16 [1975], NRC Staff Testimony on Cost-Benefit Analysis, before ASLB
Box 12, Folder 17 1976, February 18, Applicant’s Response to SAPL Renewed Motion to Reopen Hearing Filed on Behalf of Intervenor SAPL on Issue of Financial Qualifications
Box 12, Folder 18 1976, February 26, Testimony of Robert Mitchell before ASLB
Box 12, Folder 19 1976, July 20, Affidavit of Bruce B. Beckley before ASLB
Box 13
Box 13, Folder 1 1976, September 17, Brief of Applicant in Support of Its Exceptions
Box 13, Folder 2 1976, September 30, Memorandum and Order
Box 13, Folder 3 1976, October 6, Memorandum and Order
Box 13, Folder 4 1976, October 18, On Review of a Decision of the ASLAB, Brief of Applicants before NRC
Box 13, Folder 5 1976, October, NRC, Start of Cooling System Trouble
Box 13, Folder 6 1976, October, Applicant’s Presentation Concerning SAPL and Audubon Motion for Reconsideration of ALAB-338 in Light of Court Order of Oct.8, 1976
Box 13, Folder 7 1976, November 5, Memorandum and Order
Box 13, Folder 8 1976, November 12, Brief of Applicant’s in Opposition to Certain Exceptions of Other Parties on exception to the Initial decision of the ASLB
Box 13, Folder 9 1976, November l2, NRC Staff Brief in Response to the Exceptions to the Initial Decision of All Other Par ties
Box 13, Folder 10 1976, November, EPA, Region I, Initial Decision
Box 13, Folder 11 1976, November to December, Start of Cooling Trouble
Box 13, Folders 12-13 1976-1979, Testimony, Miscellaneous
Box 13, Folder 14 1976, Atomic Safety and Licensing Board
Box 14
Box 14, Folders 1-2 1976, Atomic Safety and Licensing Board
Box 14, Folder 3 1976-1977, Fire Protection for Nuclear Plants
Box 14, Folder 4 1977, January 31, Applicant’s Response to Inquiries of the Commissioner for Further Stay of Order Suspending Construction Permits, Brief of Applicants on Merit
Box 14, Folder 5 1977, January, ALSAB
Box 14, Folder 6 1977, January to March, NRC re. Cooling Tunnels, Alternate Sites
Box 14, Folder 7 1977, January to November, ALSB
Box 14, Folder 8 1977, February 11, On Review of a Decision of the ASLAB, Brief of Applicants in response to the Commission’s Order of February 7, 1977
Box 14, Folder 9 1977, February 11, Commonwealth of Massachusetts Reply to Commission’s Order of February 7, 1977
Box 14, Folder 10 1977, February 19, NECNP Response to Commission Order of February 7, 1977
Box 14, Folder 11 1977, April to November, NRC re. Cooling Tunnels, Alternate Sites
Box 15
Box 15, Folder 1 1977, February 17, Staff Reply to NECNP Brief
Box 15, Folder 2 1977, February, NRC, GAO Investigation of Seabrook
Box 15, Folder 3 1977, March to October, EPA Costle ‘Yes’ Decision, SAPL Motion for Stay
Box 15, Folder 4 1977, February to July, ASLAB
Box 15, Folder 5 1977, March 31, Appearances and Memorandum and Order
Box 15, Folder 6 1977, June, SAPL and EPA as Remanded by 1st. Circuit Court
Box 15, Folder 7 1977, July to December, ASLB
Box 15, Folder 8 1977, July, ASLAB
Box 15, Folder 9 1977, September, SAPL vs. Costle, 1st. Circuit Court
Box 15, Folder 10 1977, September, NRC to PSNH re. Physical Security at Plants
Box 15, Folder 11 1977, November, NRC to PSNH re Additional Information Needed Prior to Issuance of Operating License
Box 15, Folder 12 [1977?], NECNP Response to Staff’s Motion to Reopen the Record
Box 15, Folder 13 1978, January 16, Brief of Applicants in Opposition to Exceptions
Box 15, Folder 14 1978, January to April, Issues with the NRC

Series IV: Operating License Issues 50-443-OL, 50-444-OL, 1969-1986

(38 Boxes)

Subseries A: On-site Issues

Box 1
Box 1, Folder 1 1978, February to March, SAPL Cases before the 1st. Circuit Court of Appeals
Box 1, Folder 2 1978, February to April, 5APL before the ASLAB
Box 1, Folder 3 1978, April 28, SAPL before the ASLAB
Box 1, Folder 4 1978, May to June, Issues with the NRC
Box 1, Folder 5 1978, May to June, SAPL vs. Costle (EPA), 1st. Circuit Court of Appeals
Box 1, Folder 6 1978, June to November, SAPL before the ASLAB
Box 1, Folders 7-9 1978, July, Correspondence to Costle (EPA) re. Cooling Tunnels
Box 1, Folder 10 1978, July to September, Issues with the NRC
Box 2
Box 2, Folder 1 1979, January to April, Miscellaneous $, Assorted Financial PSNH
Box 2, Folder 2 1979, May, SAPL vs. NRC, 1st. Circuit Court of Appeals
Box 2, Folders 3-4 1979, May, “Safety and Relief Valves for PSNH”, Seismic Calculations
Box 2, Folders 5-8 1979-1981, NRC Show Cause Order, Evacuation/Class 9 (started 6/2/79), includes support material
Box 2, Folder 9 1979, September, Permittee’s Response to Motion to Suspend Construction, re. Seismic Concerns
Box 2, Folder 10 1979, House Bill 671, To Prevent Siting of a Nuclear Plant in a Town without a Vote
Box 2, Folder 11 1979, House Bill 779, re Siting of Nuclear Facilities
Box 2, Folder 12 1980, November 18, Response to NRC Staff in Opposition to Motion to Suspend Construction
Box 2, Folder 13 1980, September to December, ASLAB, re Adequacy of Seismic Calculations vis a vis Seabrook
Box 2, Folder 14 1981, June to July, Newsclips Evacuation Show Cause Order
Box 2, Folder 15 1982, January, Proposed Rule on Environmental Qualification of Electrical Equipment
Box 2, Folder 16 1984, January, Results of In-Progress Audit of Seabrook Station Detailed Control Room Design Review
Box 2, Folders 17-19 1984, March to August, Financial Qualifications as Requirement for OL
Box 3
Box 3, Folder 1 1984-1986, NECNP IB.2, Safety and On-Site Emergency Planning Issues 5/84 to 9/86
Box 3, Folders 2-3 1985-1986, NRC Staff Status Reports , On-Site Emergency Planning, 10/85 to 9/86, 1 of 2
Box 3, Folder 4 1986, March to June, Integrated Design Inspection Report
Box 3, Folder 5 1986, April to June, Integrated Design Inspection Report
Box 3, Folders 6-9 1986, July, Contention NH 10, SAPL supp.6, re Control Room Design [SAPL took over the contention of NH in July 1986 after the State dropped it]
Box 4
Box 4, Folder 1 Contention NH 10, SAPL supp.6, Pt.II, 4/83 to 6/86
Box 4, Folder 2 Contention NH 10, SAPL supp.6, Pt.II, 7/86 to 8/8/86
Box 4, Folder 3 Contention NH 10, SAPL supp.6, Pt.II, 8/18/86 to 9/17/86
Box 4, Folder 4 1986, Work Papers, SPDS Issues re SAPL actions Vis a Vis NH Contention 10
Box 4, Folders 5-16 1986, September 26, Draft SAPL supp.6. Hearings of Advisory Committee on Reactor Safeguards Subcommittee on Severe Accidents and Subcommittee on Occupational and Environmental Protection Systems
Box 4, Folder 17 1986, October, SAPL Brief and Other Material re On-Site Issues
Box 5
Box 5, Folder 1 1987, April, Suggestion of Mootness, On Site Emergency Planning and Technical Issues
Box 5, Folders 2-3 1987-1988, On-Site Emergency Planning, NECNP Pleadings re Coaxial Cable, 2 of 2, 11/87 to 5/88
Box 5, Folders 4-9 1987-1988, NECNP and Steam Generator and Bio-Fouling On-Site Issues, 11/20/87 to 1/7/88)
Box 5, Folder 10 1988-1989, On-Site Emergency Planning[1/88-7/89]
Box 5, Folder 11 1989, January 23, NRC Staff Response to Joint Intervenors’ Motions for reconsideration of CLI-88-lQ
Box 5, Folder 12 1989, March 15, NRC Staff Response in opposition to Joint Intervenor’s Appeal of LBP-89-09
Box 5, Folder 13 1989, May 11, NRC Staff Response to Intervenors’ Motions for a Stay of Low Power Operation Pending Commission of Appellate Review
Box 5, Folder 14 1989, May 24, NRC Staff Response to Intervenors’ Motion for Reconsideration of CLI-89-08 and Renewed Motion for Stay of Issuance of Low Power License
Box 5, Folder 15 (?) Safety and Relief Valves for PSNH”, 2nd. Proposal Rough Draft
Box 5, Folder 16 NRC Staff Testimony on Alternative Sites before the ASLB
Box 6
Box 6, Folder 1 Applicant’s Direct Testimony, #6, before the ASLB, re Compliance with 10 CFR 100
Box 6, Folder 2 Applicant’s Direct Testimony, #9, before the ASLB, re Effects on Commercial and Sport Fishing
Box 6, Folder 3 Applicant’s Direct Testimony, #10, before the ASLB, re Effects of Construction and Operation on Clam Flats and Clam Populations
Box 6, Folder 4 Applicant’s Direct Testimony, #13, before the ALSB, re Decommissioning
Box 6, Folder 5 Applicant’s Direct Testimony, #23, before the ASLB, re Energy and Peak Local Forecasts and Generating Capacity requirements
Box 6, Folder 6 Applicant’s Direct Testimony, #26, before the ASLB, re NE Utility’s Press Releases
Box 6, Folder 7 SAPL Direct Testimony on Need for Power, before the ASLB

Subseries B: Off-site Issues

Subseries 1: Hearings of the NRC (primarily the ASLB)

Box 6, Folder 8 1981-1982, Meeting at NRC, Environmental Review Team, 12/2/81, Meetings 5/21/82
Box 6, Folder 9 1981, July 15, Denton’s Decision re Emergency Planning
Box 6, Folder 10 1982, May 6 and 7, 1st. Prehearing Conference
Box 6, Folder 11 1982, July, 2nd. Prehearing Conference
Box 6, Folders 12-13 1982, July, Response to [Inquiries][RAD?](Emergency Preparedness Licensing[?]
Box 6, Folder 14 1982, July to December, Risk Study, Richard, Lowe and Garrick, Einal Environmental Analysis
Box 6, Folder 15 1982, September 13, Memorandum and Order
Box 6, Folders 16-18 1982-1983, NECNP Contentions, 10/82 to 7/83
Box 7
Box 7, Folder 1 1982-1983, NECNP Contentions
Box 7, Folder 2 1982, November 17, Memorandum and Order Addressing Intervenor’s Motions for Reconsideration of the Board’s Prehearing Conference Order and Motions for Certification
Box 7, Folder 3 1982-1983, NH State Interrogatories and PSNH Replies
Box 7, Folders 4-6 1982-1983, Interested Towns Under 2.715 of the Code of Federal Regulations, 11/82 to 5/83
Box 7, Folder 7 1982-1983, ASLB Board Orders, 11/82 to 8/83
Box 7, Folder 8 1983, January 10, Newburyport Plan(Draft)
Box 7, Folder 9 1983-1986, Reactor Pressure Vessel Indication, supp. cont.7, 2/83 to 5/86
Box 7, Folder 10 1983, March, Safety Evaluation Report
Box 7, Folders 11-12 1983, March, SAPL Supplement 3, Class 9 Accident and Consequences and Summary Disposition Motion
Box 8
Box 8, Folder 1 1983, March, SAPL Supplement 3…
Box 8, Folder 2 1983, March, Correspondence from Herb Moyer
Box 8, Folders 3-6 1983, March to September, Actions of Mass. Attorney General’s Office re RERP
Box 8, Folder 7 1983, April 7 and 8, 3rd. Prehearing Conference
Box 8, Folder 8 1983, May 3, SAPL’s Supplemental Responses to Applicant’s Interrogatories and Request for Production of Documents
Box 8, Folder 9 1983, June to July, Appeal Board
Box 8, Folders 10-12 1983, July to August, Hearings re Evacuation Time Estimates, NECP III12 and III13
Box 8, Folder 13 1983-1986, Control room Design Audit, 7/83 to 2/86
Box 8, Folder 14 1983, September 29, Discovery on Emergency Plans
Box 8, Folder 15 1983-1984, Motion to Dismiss Unit II’s OL Application, 10/83 to 3/84
Box 9
Box 9, Folder 1 1983, August, Newsclips, 1st. Phase ASLB Hearings, Seabrook OL
Box 9, Folders 2-4 1983, August, Emergency Planning I, Documents before August 1983 Hearings
Box 9, Folders 5-7 1983, August to September, Emergency Planning II, filings Subsequent to Aug. 1983 Hearings through Sept., Contentions of So.Hampton, Rensington, Hampton Falls, Rye
Box 9, Folders 8-12 Emergency Planning III
Box 10
Box 10, Folder 1 Emergency Planning III
Box 10, Folder 2-3 1983, Markowitz Affidavit
Box 10, Folder 4 1984, December, ETE Rebuttal
Box 10, Folder 5 1985-1987, Maine Attorney General re Qff-Site EP, 3/85 to 10/87
Box 10, Folder 6 1985-1986, Applicant’s Material re Off-Site EP Issues, 6/85 to 10/86
Box 10, Folder 7 1985-1986, Testimony re NECNP EQ Contention(I.B.2), 10/85 to 9/86
Box 11
Box 11, Folder 1 1985-1986, Massachusetts’ Actions re Emergency Response Planning, 11/19/85 to 2/21/86
Box 11, Folder 2 1986, January to May, SAPL’s Supplemental Reply to Applicant’s Interrogatories
Box 11, Folder 3 1986-1987, Rye re Off-Site EP, 1/86 to 11/87
Box 11, Folder 4 1986, February to June, South Hampton re Off-Site EP
Box 11, Folder 5 1986, February to October, Kensington re Off-Site EP
Box 11, Folders 6-7 1986, February to December, SAPL’s Contentions on NHRERP
Box 11, Folder 8 1986-1987, Board Correspondence re Off-Site EP, 2/86 to 12/87
Box 11, Folders 9-11 1986-1987, NECNP re Seabrook Operating License, 2/24/86 to 5/14/86
Box 12
Box 12, Folders 1-5 1986-1987, NECNP…, 11/12/86 to 12/4/86
Box 12, Folder 6 1986, March to November, State of New Hampshire, re EP and Off-Site Issues
Box 12, Folders 7-9 1986-1987, Applicant’s Motion for Summary Disposition re SAPL Contentions During Hearings on Off-Site EP Issues, 3/86 to 7/87
Box 12, Folder 10 1986, March, Merrimack, NH re Off-Site EP
Box 12, Folder 11 1986, March 24 to May 15, Massachusetts’ Actions re RERP
Box 12, Folder 12 1986-1987, SAPL’s Contentions re Off-Site Emergency Prep, 3/86 to 3/8
Box 13
Box 13, Folders 1-3 1986-1987, SAPL’s Contentions…
Box 13, Folder 4 1986, Exeter re Off-Site EP, 4/86 to 5/86
Box 13, Folder 5 1986, April, SAPL’s Interrogatories and Documents Requests, State of NH
Box 13, Folder 6 1986, April to June, State of New Hampshire Interrogatories and Answers
Box 13, Folder 7 1986, April to July, Draft License, etc
Box 13, Folder 8 1986-1987, EPZ Reduction, 4/86 to 4/87
Box 13, Folder 9 1986, May 14, State’s response to NECNP’s Interrogatories and Requests for Docs
Box 13, Folder 10 1986, May 15, SAPL’s 4th. Supplemental Petition for Leave to Intervene
Box 13, Folder 11 1986, May 21 to July 10, Massachusetts’ actions re ERP
Box 13, Folders 12-13 1986, May, Motions for Sum. Dismissal by PSNH
Box 14
Box 14, Folder 1 1986, May, Off-Site Emergency Planning Issues, Affidavits
Box 14, Folder 2 1986, May, Off-Site Emergency Planning Issues, Affidavits
Box 14, Folder 3 1986, May, Off-Site Emergency Planning Issues, Motions for Summary Disposition
Box 14, Folder 4 1986, June 27, SAPL Response and Objection to PSNH Pursuit of Low Power OL
Box 14, Folder 5 1986-1987, Hampton Falls, NH re Off-Site Ep, 6/86 to 11/87
Box 14, Folder 6 1986-1987, Town of Amesbury, MA, Emergency Response Plans and ASLB, 7/86 to 11/87
Box 14, Folder 7 1986, August 15 to December 30, MA. Actions re ERP
Box 14, Folders 8-13 1986-1988, Letters to Board(ASLB), 9/86 to 4/88
Box 14, Folder 14 1986-1988, Sept to Oct, Seabrook(Town of) re Off-Site EP
Box 14, Folder 15 1986-1987, Commonwealth of Massachusetts response to Zone Reduction Plan, ERP, 10/86 to 1/87
Box 15
Box 15, Folder 1 1986-1987, MA. Response to Zone Reduction Plan
Box 15, Folders 2-3 1986-1987, O% License Appeal, 10/86 to 1/87
Box 15, Folder 4 1986-1987, State of New Hampshire, re Emergency Planning and Off-Site Issues, 12/86 to 10/87
Box 15, Folder 5 1986-1987, MA. Actions re ERP, 12/30/86 to 3/25/87
Box 15, Folder 6 1986, Miscellaneous re Off-Site Emergency Planning and Safety Issues
Box 15, Folder 7 1987, January 16, Excerpt of Transcript from LEA’s Contentions as an Intervenor at Limerick
Box 15, Folder 8 1987, January, Phillips Exeter Academy re Reduction of EPZ
Box 15, Folder 9 1987-1988, January, ASLB Hearing Notes
Box 15, Folder 10 1987, March 30 to April 15, MA. Actions re ERP
Box 15, Folder 11 1987, March to June, Miscellaneous Material Dealing with Off-Site Emergency Prep before NRC
Box 16
Box 16, Folder 1 1987, April 27 to June 15, MA. Actions re ERP
Box 16, Folder 2 1987, April, Affidavits
Box 16, Folder 3 1987-1988, Testimony and Notes re Seabrook Area Traffic and Off-Site Emergency Planning Hearings, 4/87 to 1/88
Box 16, Folders 4-5 1987, May 7, Information re KLD Survey to SAPL from MA. A.G.
Box 16, Folders 6-7 1987, May to Sept, Off-Site EP
Box 16, Folder 8 1987, May to Dec, SAPL re Off-Site Emergency Planning
Box 16, Folder 9 1987, June 11, Mileti Deposition, pp.l-60
Box 16, Folder 10 1987, June 11, Mileti Deposition, pp.61-126
Box 16, Folder 11 1987, June 11, Mileti Deposition. pp.127-end
Box 16, Folder 12 1987, June 29 to November, Mass Actions re ERP
Box 16, Folder 13 1987, June to July, Applicant’s Discovery re Off-Site Emergency Planning
Box 16
Box 16, Folders 1-3 1987-1988, Utility Plan re Submission of MA. Plan (SPMC), Vacation of Stay, 7/87 to 2/88
Box 16, Folder 4 1987, September 11, Testimony of David P. MacDonald for SAPL re SAPL Contentions 8 and 8a Relative to the Town of Rye
Box 16, Folder 5 1987, September 14, Testimony of Avishai Ceder, Off-Site Emergency Prep
Box 16, Folder 6 1987, September 14, Testimony of Thomas J. Adler, Off-Site Emergency Prep
Box 16, Folder 7 1987, September 14, Testimony of Colin High, Thomas J. Adler and William A. Befort, Off-Site Emergency Prep
Box 16, Folders 8-9 1987, September 14, Testimony of Dr. Albert Luloff on Behalf of James Shannon, MA. A.G., re Off-Site EP
Box 16, Folder 10 1987, September 14, Testimony of Donald J. Zeigler, James H. Johnson Jr., and Stephen Cole on behalf of the MA. A.G.
Box 18
Box 18, Folder 1 1987, September 14, Test. of Zeigler et al..
Box 18, Folder 2 1987, September 14, Testimony of Steven Sholly on the Technical Basis for NRC E.P. Rules, etc…
Box 18, Folder 3 1987, September 14, Attachments to the Testimony of Steven C. Sholly
Box 18, Folder 4 1987, September, Off-Site EP Issues, Prefiled Testimony
Box 18, Folder 5 1987, September, Testimony of Dr. Thomas Urbanik II on Behalf of the NRC Staff on Town of Hampton Contention III and SAPL Contentions 18, 31, 34 and 37
Box 18, Folder 6 1987-1988, re Atty. General Shannon and hearings on NHRERP, 9/87 to 2/88
Box 18, Folders 7-9 1987-1988, Sheltering Issues, 9/87 to 3/88
Box 18, Folder 10 1987-1988, October, PSNH Testimony on Notification/Communications in Evacuation Plans
Box 18, Folder 11 1987-1988, Proposed Findings for SAPL Contentions before the ASLAB, 10/87 to 2/88
Box 18, Folder 12 1987, October, Testimony of Daniel Trahan on Behalf of Town of Hampton and SAPL Regarding Town of Hampton Revised Contentions III, IV and V and SAPL Contentions 16, 25
Box 18, Folder 13 1987, December 14, Documents re Testimony of Dr. Albert Luloff for A.G. of MA
Box 19
Box 19, Folders 1-2 1988, January 7, MA. Actions re ERP.
Box 19, Folder 3 1988, January 11 to March 18, MA. Actions re ERP.
Box 19, Folder 4 1988, January 12, Hearings Before ASLB, Off-Site Emergency Planning Evidentiary Hearings
Box 19, Folders 5-7 1988-1989, Scheduling Pleadings, SPMC Litigation, 2/88 to 2/89
Box 19, Folder 8 1988, April 7 to May 2, MA. Actions re ERP
Box 19, Folder 9 1988, June 30 to July 6, MA. Actions re ERP
Box 19, Folder 10 1988, July 7, MA. Actions re ERP
Box 20
Box 20, Folder 1 1988, July 20 to October 19, MA. Actions re ERP
Box 20, Folder 2 1988, November, Meeting with PSNH re Low Power License
Box 20, Folder 3 1989, February, Commission Target Data, FOIA Request in re Target Schedule for Final Initial Decision in PSNH et al
Box 20, Folders 4-5 1989, March 1, Mass. Actions re ERP
Box 20, Folder 6 1989, March 7 to 17, NRC Staff’s Pre-trial brief on Contentions Concerning the Seabrook Plan for MA. Communities (SPMC) and Supplemental Requests
Box 20, Folder 7 1989, March 16 to May 16, Mass Actions re ERP
Box 20, Folder 8 1989, March 17, NRC Staff Motion for Leave to File Out of Time
Box 20, Folder 9 1989, March 17, NRC Staff’s Opposition to MA. AG’s Motion for Directed Certification Qf LBP-89-8
Box 20, Folder 10 1989, April 3, Letter from Flynn, Ass. General Council to FEMA, to ASLB re PSNH et al
Box 20, Folder 11 1989, April 17, NRC Staff Motion to Strike Intervenor’s Notices of Appeal of LBP-89-10
Box 20, Folder 12 1989, May 8, Letter with Enclosures from We the People to Samuel Chilk, Secretary NRC
Box 20, Folder 13 1989, May 11, MA. AG’s Opposition to Applicant’s Motion to Dismiss Joint Intervenor Contentions
Box 20, Folder 14 1989, May 16 to 31, MA. Actions re ERP
Box 20, Folder 15 1984, May 21, Declaration of Vernon E. Adler before the ASLB re PSNH et al
Box 20, Folder 16 1989, May 22, NRC Staff’s Response to MA. AG’s Motion for Directed Classification of the Licensing Board’s Oral Ruling Dismissing Contention l9(D)
Box 20, Folder 17 1989, June 12 to July 17, MA. Actions re ERP
Box 20, Folder 18 1989, September 25, Emergency Exercise Objective and Scenario Guidelines for Exercise Schedule

Subseries 2: New Hampshire Off-Site Emergency Preparations and Miscellany

Box 21
Box 21, Folder 1 1981-1986, Civil Defense Meetings, Letters, etc, 6/81 to 2/86
Box 21, Folder 2 1982-1983, Local Plan Review, 10/82 to 10/83
Box 21, Folder 3 1982-1984, Seacoast Evacuation, 11/82 to 2/84
Box 21, Folder 4 1983, February to March, Chamber of Commerce, Hampton Beach Area, Before the NRC
Box 21, Folder 5 [1984], Exeter Citizens Concerned About Evacuation Planning
Box 21, Folder 6 1985, April to November, Newsclips on Evacuation
Box 21, Folder 7 1985, May to October, Town Councilors, letter to, re Evacuation
Box 21, Folder 8 1985-1986, Citizen’s Meeting re Emergency Planning, 10/85 to 4/86
Box 21, Folder 9 1986, January, revision 1 of NHRERP
Box 21, Folder 10 1986, March to April, Town Meetings and Nuclear Dump Resolution
Box 21, Folder 11 1986-1987, League of Towns, 6/86 to 3/87
Box 21, Folder 12 1986, November 10, R.L. Kaufmann’s Comments on NHRERP
Box 21, Folder 13 1986-1987, Strategy Meeting re Seabrook Interventions, 12/86 to 6/87
Box 21, Folder 14 1986-1988, Correspondence re NHRERP (not SAPL originated)
Box 21, Folder 15 1987, State Legislation
Box 21, Folder 16 1988, June 28, Miscellaneous Evacuation
Box 21, Folders 17-20 1988, November 28, Update of NHRERP
Box 22
Box 22, Folder 1 1988, November 28, Update of NHRERP
Box 22, Folder 2 Data from Plans, Rev.0, re Off-Site Emergency Plans
Box 22, Folder 3 Data from Plans, Rev.2
Box 22, Folder 4 Notebook, Notes on Rev.2 RERP
Box 22, Folder 5 Notes re RERP
Box 22, Folder 6 State of New Hampshire Radiological Emergency Response Plan
Box 22, Folder 7 Town Plan Contention Notes
Box 22, Folder 8 Warrant Articles re Evacuation

Subseries 3: Massachusetts Off-Site Emergency Preparations

Box 22, Folders 9-11 1985-1986, Massachusetts Evacuation Plans, 1/85 to 11/86
Box 22, Folder 12 [1985], MA. A.G.’s Letter to Towns
Box 22, Folder 13 1985, June to August, MMWEC Report, Section on Emergency Planning
Box 22, Folder 14 1986, January 10, Evacuation Plan Update for Seabrook Station, Progress Report 3, Produced by KLD and Associates for the State of Massachusetts
Box 22, Folder 15 1986, January 18, Evac Plan Update, Progress Report 4
Box 22, Folder 16 1986, February 18, Evac Plan Update, Progress Report 5
Box 22, Folder 17 1986, April, Evac Plan Update, ETE by KLD, Progress Report 6 and final
Box 23
Box 23, Folder 1 1986, April, Evacuation Plan Update, Progress Report 7 for MA. CDA and OEP
Box 23, Folder 2 Notes on KLD Evac Time Estimates and Reports in their Progress in Making Them
Box 23, Folder 3 KLD Survey of Seabrook Area

Subseries 4: Other Government Bodies Involved in Emergency Preparation Issues

Subseries a: Congress

Box 23, Folder 4 1981, Congressional Committees
Box 23, Folder 5 1982, November to December, Sandia Report (NUREG/CR 2239), Technical Consequences for Siting Criteria Development and Dangers of Meltdown
Box 23, Folder 6 1983, June to November, Licensing “Reform” Legislation
Box 23, Folder 7 1983-1984, Temporary Operating License Legislation
Box 23, Folder 8 1983, Senator Simpson Weakens Emergency Planning Regs
Box 23, Folder 9 1983-1984, Simpson’s 2nd. Onslaught on Emergency Planning
Box 23, Folder 10 1986, October 10, ACRS(Advisory Committee on Reactor Safeguards) Hearings
Box 23, Folder 11 1986, “Licensing Reform”
Box 23, Folders 12-14 1986-1987, Price-Anderson Act
Box 24
Box 24, Folder 1 1987, Congressional Legislation
Box 24, Folder 2 1987-1988, Humphrey, Gordon, re Emergency Planning, 1/87 to 12/88
Box 24, Folder 3 1988, NRC “Reform” Bill

Subseries b: Courts

Box 24, Folder 4 1981, DC Circuit Court of Appeal, 81-2146
Box 24, Folder 5 1983, Supreme Court Ruling on California Moratorium
Box 24, Folder 6 19881986, August, Suit v. NRC re Training for Nuclear Plant Workers, sect. 306 of NWPA.
Box 24, Folder 7 19881986, Decommissioning Suit Hearings, Cushing v. Sununu et al
Box 24, Folder 8 19881987, February, Motion for Partial Summary Judgement in Hampton v. State et al
Box 24, Folder 9 Nuclear Litigation, Legal Precedents, Notes

Subseries c: FEMA

Box 24, Folder 10 1980, January to October, SAPL-FEMA
Box 24, Folder 11 1980, Seabrook Station Evacuation Analysis Prepared for FEMA
Box 24, Folder 12 1985-1986, Pressure on FEMA, 3/85 to 6/86
Box 24, Folder 13 1986, February to June, FEMA Graded Exercises for Emergency Evacuation
Box 24, Folder 14 1988, January to October, Memorandum re Review of Seabrook Plan for Massachusetts Communities
Box 24, Folder 15 1988, October, Review and Evaluation of Seabrook Plan for MA. Communities
Box 24, Folder 16 1988, November 22, Response of FEMA to Town of Amesbury’s First Set of Interrogatories and Request for Production of Documents to FEMA on Seabrook Plan for Massachusetts Communities
Box 24, Folder 17 1988, December 9, Reply by FEMA to the Mass A.G.’s Motion to Compel Response by FEMA to Interrogatories and Requests for Production of Documents
Box 24, Folder 18 1988, December 14, Letter to Victor Stello, NRC, from FEMA
Box 24, Folder 19 1988, December, FEMA Region 1, Report of the Public Meeting for the Seabrook Nuclear Power Station Held on July 2, 1988
Box 25
Box 25, Folder 1 1988, December, Raviaw of the State of New Hampshire RERP for Seabrook Station, FEMA
Box 25, Folder 2 1988, December, Findings and Determinations Seabrook Nuclear Power Station
Box 25, Folder 3 1988, December, Review and Evaluation of the Seahrook Plan for MA. Communities
Box 25, Folder 4 1988, December, Review and Evaluation of the State of Maine Ingestion Pathway Plan for Seabrook Station
Box 25, Folder 5 1988, December, Status of Corrective Actions for the 1988 FEMA Graded Exercises for Seabrook Station
Box 25, Folder 6 1989, January 5, Letter to Brown, PSNH, re FEMA Consolidated Report on Seabrook Off-Site Planning and Preparedness
Box 25, Folder 7 1989, January 6, Certificate of Service
Box 25, Folder 8 1989, January 9, FEMA’s Qpposition to Mass A.G.’s Motion to Compel and Supplemental Responses, etc
Box 25, Folder 9 1989, April 7, Forwarding of FEMA Findings on the Maine Ingestion Pathway Plan
Box 25, Folder 10 1979, April 21, FEMA Reply to MA. A.G.’s Motion to Compel Production of Documents from FEMA
Box 25, Folder 11 Info Sheet re FEMA Drill

Subseries d: NRC

Box 25, Folder 12 1975-1980, NRC Evacuation Guides (Emergency Response Planning)
Box 25, Folders 13-15 1981-1983, NRC Safety Goals, 7/81 to 7/8
Box 25, Folder 16 1981, November 23, NRC CRAC/COMO
Box 26
Box 26, Folder 1 1981, November 23, NRC CRAC/COMO
Box 26, Folder 2 1981, May to August, NRC Proposed Rule Changeswith SAPL Annotations
Box 26, Folder 3 1981, December 15, Proposed NRC Rule Changes on Emergency Planning
Box 26, Folders 4-5 1982, January to November, Risk Analysis
Box 26, Folder 6 1982-1984, Probabilistic Risk Assessment, 1/82 to 2/84
Box 26, Folder 7 1982, Need for Power, NRC
Box 26, Folder 8 1983, January to November, ACRS Hearing, April 1 and 2, 1983
Box 26, Folder 9 1983, August, NRC Hearings
Box 27
Box 27, Folder 1 1984, July to September, Asseltine’s Tour of Seabrook
Box 27, Folder 2 1984, September to December, NRC Severe Accident Policy
Box 27, Folder 3 1984, Environmental Qualifications of Electrical Equipment
Box 27, Folder 4 1984-1985, Source Terms
Box 27, Folder 5 1986-1987, FOIA Request for Information Dealing with Dose Calculations, 4/86 to 4/87
Box 27, Folder 6 1986, October, NRC Staff Draft Testimony for Congressional Hearing on Seabrook
Box 27, Folder 7 1986, October to December, NRC Correspondence re Worker’s Allegations
Box 27, Folder 8 1986, NRC Litigation, “Next Round”

Subseries e: Miscellaneous Goverment Groups

Box 27, Folder 9 1977, April 27, Newington Testimonies before the EPA re Atlantic Terminals Corporation
Box 27, Folder 10 1987, Fairness Doctrine

Subseries 5: Miscellaneous Subject Files, re: Emergency Planning

Box 27, Folder 11 1981, Academic Articles re Evacuation and Emergency Planning
Box 27, Folder 12 1983, April, “An Argument Versus Current Nuclear Power Generation Based on the Experiences of an Engineer,” Markowitz, George T
Box 27, Folder 13 1982, August 19, Catawba-ASLAB-687
Box 27, Folder 14 1986, Comments on NHRERP by Ronald Kaufmann
Box 27, Folder 15 Directory of Environmental Groups in New England
Box 27, Folder 16 1986, October, Drug and Alcohol Abuse at Seabrook
Box 28
Box 28, Folder 1 1975, December, “The Economics of Nuclear Power: A New England Perspective”
Box 28, Folders 2-4 1986-1987, EPZ Reduction Effort by New Hampshire Yankee, 7/86 to 3/87
Box 28, Folder 5 1983-1983, Emergency Workers, 6/82 to 3/83
Box 28, Folders 6-8 1980-1981, Evacuation Information
Box 28, Folders 9-11 Evacuation Time Study, E.T.E.
Box 28, Folder 12 1982, October, “Further Analysis and Interpretation of the Shoreham Evacuation Plan”
Box 28, Folders 13-14 1975-1980, General Evac. Plans (Not NRC Guides)
Box 29
Box 29, Folder 1 1975-1980, General Evacuation Plans
Box 29, Folder 2 Governor’s Task Force on DOE’s Crystalline Repository Project
Box 29, Folders 3-5 1983-1984, State Issues Committee, Greater Portsmouth Area Chamber of Commerce
Box 29, Folder 6 1984, Chamber Candidate’s Breakfast
Box 29, Folder 7 1984-1985, Electric Rate Issue Subcommitte of the Greater Chamber of Commerce
Box 29, Folder 8 1986, Herb’s Plan Critique Materials
Box 29, Folder 9 1981, HMM Reports
Box 29, Folder 10 1982, Independent Estimate of ETE for a Peak Population Scenario in the EPZ of Seabrook Nuclear Power Station, pp.i to iii-29
Box 29, Folder 11 1982, Independent Estimate of ETE, pp.iv to figure 14
Box 29, Folder 12 1982, Independent Estimate of ETE, pp.figure 15 to table 44
Box 29, Folder 13 1982, Independent Estimate of ETE, pp.table 45 to table 54
Box 29, Folder 14 1982, Independent Estimate of ETE, pp.table 55 to end
Box 29, Folder 15 1986, Miscellaneous Emergency Planning
Box 29, Folder 16 1985, Miscellaneous Emergency Prep, Evacuation Time Estimates
Box 30
Box 30, Folder 1 1986-1987, Miscellaneous Emergency Prep, Miscellaneous Material, 7/86 to 3/87
Box 30, Folder 2 1986-1987, Miscellaneous Emergency Prep, Sheltering Issues, 3/86 to 2/87
Box 30, Folder 3 1986-1987, Miscellaneous Emergency Prep, Traffic Issues, 7/86 to 8/87
Box 30, Folder 4 1986-1987, Miscellaneous Emergency Prep, Training, 3/86 to 3/87
Box 30, Folder 5 1982-1987, Miscellaneous Emergency Prep, Health and Medical Preparation, 4/82 to 3/87
Box 30, Folder 6 1982 to 1983, Misecellaneous, Related to Seabrook Operating License, 4/84 to 5/83
Box 30, Folder 7 1986, January to March, Non-SAPL, News Releases and Letters to the Editor
Box 30, Folder 8 1988, October 20, Notes from Deposition of George Gram
Box 30, Folder 9 1988, November 1, Notes from Deposition of Joseph Ellis
Box 30, Folder 10 1988, November 7, Notes from Deposition of Gilbert Cahill
Box 30, Folder 11 1988, November 10 and 11, Notes from Deposition of Richard W. Donovan
Box 30, Folder 12 Nuclear Power and Psychology Related Matters
Box 30, Folder 13 1983, NRC Commissioners
Box 30, Folder 14 Nuclear Waste in New Hampshire
Box 30, Folder 15 Potassium Iodide
Box 30, Folder 16 1981-1983, Power Lines
Box 30, Folder 17 PSCo Meeting Draft Copy on Evac Time Estimates
Box 31
Box 31, Folder 1 “PSCo Evac Propaganda.”
Box 31, Folder 2 Radiological Monitoring in New Hampshire
Box 31, Folder 3 Seabrook Unit II Delay
Box 31, Folder 4 Seabrook Unit 2′s Cancellation, Clippings
Box 31, Folders 5-7 1986, January, “The Source Term Debate,” a Report by the Union of Concerned Scientists, (attachment 3 to the Affidavit of Gordon Thompson)
Box 31, Folder 8 1986, March, Special Transportation Needs
Box 31, Folder 9 “Sununu’s Whitewash Blue Ribbon Committee,” To Review Post-Chernobyl Nuclear Safety Concerns
Box 31, Folder 10 1985, September to November, Three Mile Island Health Studies

Subseries C: Financial Issues

Box 32
Box 32, Folder 1 1980-1984, Seabrook Economics and Financing
Box 32, Folder 2 1981-1984, Stockholder Actions, 1/81 to 8/84
Box 32, Folder 3 1981-1985, Sununu’s and PUC Cost Statements and Proposals
Box 32, Folder 4 1981, July, PUC Peak Demand Investigation
Box 32, Folder 5 1981, November to December, PUC Testimony Rate Case, DE 81-304, (SAPL Testified 12/81)
Box 32, Folder 6 l981-1982, DE 81-312, Supply and Demand of NH for Electricity regarding Seabrook II. Fall 1982 to 1983, (11/81 to 12/82)
Box 32, Folder 7 1982, February 2, United Nuclear Opponents Press Conference on Seabrook Finances
Box 32, Folder 8 1982, March 10, Attempt to Intervene Before PUC on PSNH’s Request to Sell 3 Million Shares of Common Stock, DF82 63 SAPL Appealed Exclusion from Hearing to NH Supreme Court
Box 32, Folder 9 1982, June, PUC DF 82-141 Bona Fide Response from Other Utilities in Attempted Selldown
Box 32, Folder 10 1982, July 7, Press Conference with Richard Rosen
Box 32, Folder 11 1982-1984, PSNH’s Bond Rating
Box 32, Folder 12 1983, January to December, Cost cap Intervention
Box 32, Folder 13 1983, March to April, PUC Commissioners and Appointments
Box 32, Folder 14 1983-1984, Construction Completion Dates, 3/83 to 3/84
Box 32, Folder 15 1983, May to October, Joint Owners
Box 32, Folder 16 1983, July to October, Spirou on Seabrook
Box 32, Folder 17 1983, September, CAP Legislation
Box 32, Folder 18 1983, September to October, Bob’s Press Conference on Sununu Charges
Box 32, Folder 19 1983, October 17, PSNH Rate Hike Request ($33 million, 9.45%)
Box 32, Folder 20 1983-1984, Rate Shocks, 10/83 to 10/84
Box 33
Box 33, Folder 1 1983-1984, Seabrook Capital Costs, 12/83 to 3/84
Box 33, Folder 2 1984, January to March, Town Warrant Article on Special Sessions
Box 33, Folder 3 1984, January to June, Donaldson, Lufkin and Jenrette
Box 33, Folder 4 1984, March, Jobs at Seabrook
Box 33, Folder 5 1984, March, Phantom Taxes
Box 33, Folder 6 1984, March to May, Palast’s Study, “The Impact of Rising Electric Rates on the Economy of New Hampshire”
Box 33, Folder 7 1983-1984, Rate Shocks, 10/83 to 10/84
Box 33, Folder 8 1984-1986, Timeline Df 84-200, 3/84 to 1/86
Box 33, Folder 9 1984-1986, Appeal to New Hampshire Supreme Court, PUC Order in DF 84-200, June to Nov, 1985
Box 33, Folder 10 1984-1986, Briefs Before the PUC re 84-200, Campaign for Ratepayer’s Rights’ Initial Brief, March 15, 1985
Box 33, Folder 11 1984-1986, Briefs Before the PUC re Df 84-200, Brief on Behalf of SAPL
Box 33, Folder 12 1984-1986, Briefs Before the PUC re DF 84-200, Reply Brief on Behalf of SAPL
Box 33, Folder 13 1984-1986, Briefs Before the PUC re DF 84-200, Brief on Behalf of SAPL
Box 33, Folder 14 1984-1986, Briefing Miscellany for DF 84-200
Box 33, Folder 15 1984-1986, Commission Orders, Df 84-200, April to September 1985
Box 33, Folder 16 1984-1986, Cross Examination of Bruce Ellsworth
Box 33, Folders 17-18 1984-1986, Exhibits, DF 84-2Q0
Box 34
Box 34, Folder 1 1984-1986, Exhibits re Prices
Box 34, Folder 2 1984-1986, Hearings on PSNH’s Request for Lifting of Spending Restrictions of $5m wk., July 1985
Box 34, Folder 3 1984-1986, Newsclips Bearing on DF 84-200 Case, 12/84 to 10/85
Box 34, Folder 4 1984-1986, Notes Etc., DF 84-200, March 1984 to January 1985
Box 34, Folder 5 1984-1986, Notes Etc., DF 84-200, November 1984 to February 1985
Box 34, Folder 6 1984-1986, Price Projections, Nominal and RWH from Aeschliman’s Dissent
Box 34, Folder 7 1984-1986, Public Utilities Commission Final Order, DF 84 200, April 18, 1985
Box 34, Folder 8 1984-1986, Rosen’s Testimony, DF 84-200
Box 34, Folders 9-10 1984-1986, SAPL’s Motions re DF 84-200, July to September 1985
Box 34, Folder 11 1984-1986, Separate Opinion of Commissioner Aeschliman re 84-200
Box 34, Folder 12 PUC Finance Hearing, PSNH Seeks Authorization to Issue May 24, 1984, DR 84-121
Box 35
Box 35, Folder 1 PUC Finance Hearing
Box 35, Folder 2 1984, May to October, Newbrook, (“Newbroke”)
Box 35, Folder 3 1984, June to July, Appeal of Roger Easton
Box 35, Folder 4 1984, June to August, Derivative and Class Action Suits
Box 35, Folder 5 1984, June to August, Derivative and Class Action Suits
Box 35, Folders 6-8 1984, June 24-25, Auth. to Borrow $425 Million, 84-168 Restructure of Agreements with Creditors
Box 35, Folder 9 1984, September, Touche-Ross
Box 35, Folder 10 1984, September, John N. Nassikas
Box 35, Folder 11 1984, September, PSNH’s Petition for Original Jurisdiction
Box 35, Folder 12 1984-1985, Chapter 11 Option, 9/84 to 4/85
Box 35, Folder 13 1984, October, MAC Report
Box 35, Folder 14 1984, November, SAPL II, Appeal of SAPL Before State Supreme Court, 84-502
Box 35, Folder 15 1984, December 13, Maine PUC Order and NU Maine Co., etc
Box 36
Box 36, Folder 1 1984, February to November, PUC Hearing 83-398, Transfer of Question of RSA 378-50-A Interpretation to Supreme Court
Box 36, Folders 2-3 1984-1985, DF 83-360, Coop Case, 12/84 to 6/85
Box 36, Folder 4 1984, Cavanagh’s Papers
Box 36, Folder 5 1984, Regional Meetings
Box 36, Folder 6 1985, March 15, Briefs Before the PUC for DF 84-200, Trial Brief of PSNH
Box 36, Folder 7 1985, March to September, Anti-Trust Investigation
Box 36, Folder 8 1985, April, MA. DPU Decision in DPU 84-152 (Seabrook Generic Finance Case)
Box 36, Folders 9-10 1985, June, “Seabrook: An Evaluation,” Report by MMWEC
Box 36, Folder 11 1985, September, Appeal of the Conservation Law Foundation, Inc. to State of NH Supreme Court
Box 37
Box 37, Folder 1 1985, September to November, Notes on Arguments to Supreme Court, FEMA Preliminary Review of NH Plans, Amesbury Meeting
Box 37, Folder 2 1985, November 8, Opinion of PUC After Remand
Box 37, Folders 3-4 1985-1987, PSNH Form 10k
Box 37, Folder 5 1986, January 31, Supreme Court Ruling, Appeal of Conservation Law Foundation
Box 37, Folder 6 1986, March 3, Appeal of McCool and Eastman re 85-139
Box 37, Folder 7 1986, PSNH’a Avoided Cost Filing re SPP
Box 37, Folder 8 Alternatives to Seabrook. Liscond Paper
Box 37, Folders 9-10 CWIP, Construction Work in Progress
Box 37, Folder 11 1985, April, Gambit Report, “Is the NRC Licensing Unsafe Nuclear Power Plants?”
Box 37, Folder 12 Lazar’s Paper
Box 37, Folder 13 Miscellaneous
Box 37, Folder 14 Seabrook Investor, Central Maine Power
Box 37, Folder 15 Seabrook Investor, Central Vermont Public Service
Box 38
Box 38, Folder 1 Seabrook Investor, Connecticut Utilities
Box 38, Folder 2 Seabrook Electric, Fitchburg Gas and Electric Co
Box 38, Folder 3 Seabrook Investors, Massachusetts Municipal Wholesale Electric Company
Box 38, Folder 4 Seabrook Investor, New England Power Company
Box 38, Folder 5 Seabrook Investor, New Hampshire Electric Coop
Box 38, Folder 6 Seabrook Investor, Vermont Electric Coop
Box 38, Folder 7 Seabrook Investor, Vermont Public Service Board

Series V: Miscellaneous Seabrook Documents from Soruces Other than SAPL, 1974-1988

(1 Box)

Box 1
Box 1, Folder 1 1974, June, Evacuation Risks – An Evaluation
Box 1, Folder 2 1980, August, Seabrook Station Evacuation Analysis, Final Report
Box 1, Folder 3 1980, August, Seabrook Station Evacuation Analysis, Technical Memorandum #1
Box 1, Folder 4 1981, November, Contract Between the New Hampshire Civil Defense Agency and Costello, Lomasney and deNapoli, Inc., Consulting Engineers To Develop a Radiological Emergency Response Plan for the Seabrook Nuclear Power Plant
Box 1, Folder 5 1984, January, Seabrook Station Public Alert and Notification System, Final Design Report
Box 1, Folder 6 1986, June, Final Exercise Assessment, Joint NH State and Local Radiological Emergency Response Exercise for the Seabrook Nuclear Power Plant
Box 1, Folders 7-10 1987, July, Risk Management Actions to Assure Containment Effectiveness at Seabrook Station
Box 1, Folder 11 1988, March 3, Comments of Mass. A.G. Shannon in Opposition to Nureg-0654/FEMA Rep. 1, Rev. 1, Supp.1, “Criteria for Utility Offsite Planning and Preparedness”